East Brandywine Fire Company
East Brandywine Fire Company

2026 Incidents
Fire Medical Total
Jan 53 35 88
Feb 34 23 57
Mar 32 27 59
Apr 26 38 64
May 38 47 85
Jun 35 37 72
Jul 44 37 81
Aug 33 27 60
Sep 37 37 74
Oct
Nov
Dec
Total 332 308 640

Past Incident Totals 2020-Present
Fire Medical Total
2025 455 355 810
2024 483 419 902
2023 413 388 801
2022 415 286 701
2021 367 224 591
2020 353 256 608
Total 2486 1928 4413

Past Incident Totals 2006-2019
Fire Medical Total
2019 360 554 914
2018 350 550 900
2017 330 484 814
2016 356 402 758
2015 373 376 749
2014 426 430 856
2013 366 451 817
2012 380 431 811
2011 362 445 807
2010 300 422 722
2009 262 426 688
2008 327 448 775
2007 322 469 791
2006 333 465 798
Total 4847 6353 11200

Web Counters
Website Visitors
Since
January 1, 2012
5,991,271
Visitors Today
Nov 08, 2026
1,426

Volunteers Battle Late Morning House Fire

Print this story (opens in a new tab)News RSS feed (opens in a new tab)Share on Facebook (opens in a new window)Share on X (opens in a new window)Add a comment

By East Brandywine Fire Company
November 4, 2013

On Sunday, November 3rd, 2013 the East Brandywine Fire Company was dispatched to assist Glen Moore Fire Company for a reported house fire. Additionally Lionville Fire Company, Wagontown Fire Company for Rapid Intervention, and Elverson Ambulance, were due on the Box.

The call was dispatched at 10:42 to the unit block of Walnut Bank Road in Wallace Township. Chief Seese responded immediately and arrived on location within two minutes of the call to 911 and reported flames showing through the roof of the home.

Chief Seese established "Walnut Bank Command" and proceeded to perform an entire size-up of the home as firefighters were responding to the scene.

East Brandywine Deputy Chief Rees arrived and was assigned as the operations officer while East Brandywine Chief Edwards was assigned to firefighter accountability and manpower coordination.

Engine 48-1 arrived minutes later laying water supply line from the corner of Little Conestoga and Walnut Bank Roads. Once at the dwelling, crews quickly deployed an attack hose to the second floor to begin extinguishing the fire.

Engine 48-5 arrived just after Engine 48-1 and set up for water supply operations and supplied water to the scene due to no fire hydrants in the area. The entire rural water supply operation was established in under two minutes.

Crews remained on location for over two hours with extensive salvage and overhaul operations while firefighters battled complicated and vulnerable conditions of a home with a wood shingle roof.

Fortunately, due to the quick response of volunteers and an aggressive attack on the fire, the damage was limited to the area of origin and the portion of the home which was already consumed upon the arrival of the first fire units.


Add a Comment 0 Comment(s)


Home Donate Membership Info News Archives Contact Us Members Area
Website Designed and Hosted By:
Firehouse Solutions
www.FirehouseSolutions.com
Content Provided and Maintained by:
East Brandywine Fire Company
2096 Bondsville Road
Downingtown, PA 19335
Phone: 610-269-2625
E-mail: info@ebfc49.org
Copyright © 2026 Firehouse Solutions (Service of Technology Reflections, Inc.)